project will replace the aging bookstore building (
9A
), provide much needed additional administrative offices for the Instruction team, and construct flexible space for program growth and college services.
The two-story 50,000-gross-square-foot facility will be located to the south of the Student Center and to the east of the Science Complex. The second floor Instruction Offices will directly connect to the second floor of the Student Center and “Miracle Mile” pedestrian pathway by way of an elevated pedestrian bridge.
Construction fencing in Lot D will be added for the future
Technology and Health
replacement project.