The University of Tennessee - Campus Map

Table of Contents

Locations

  1. Construction

    1. Summer 2026

      1. Sidewalk Closure

        1. Carrick / Geier Sidewalk Alignment

          Connecting of two sidewalks between Carrick and Geier Halls on the west side of Frances St.

          (Summer 2026)