  1. Active Construction Projects

    1. Copper Basin Building

      • Copper Basin Roof Replacement, 05/28/25-06/17/25: The single-ply membrane roof on Copper Basin was installed in 1996, is beyond its useful life and is in need of replacement. This project would install a layover roof over the entire building making it a 2 layer roof.