Boise State University Campus Map

Table of Contents

Locations

  1. Active Construction Projects

    1. Ruch Engineering

      Ruch Engineering Building Boiler, 07/10/24-12/16/25: This project will replace the existing boiler with a new. unit to ensure the building can operate optimally.