Active Construction Projects
ExtraMile Arena
Three projects:
Arena Rigging Grid Fall Protection, 04/02/25-05/05/25:
An adequate fall protection system in an area where overhead work is commonly performed will be installed.
Arena Roof Replacement, 09/08/25-01/25/26:
The existing roof will be replaced as part of the Capital Renewal project.
Generator replacements, 05/12/25 08/13/25:
The generators are reaching end of life and replacing these will ensures that systems operate when they are needed to protect occupants.