  1. Active Construction Projects

    1. ExtraMile Arena

      Three projects:

      • Arena Rigging Grid Fall Protection, 04/02/25-05/05/25: An adequate fall protection system in an area where overhead work is commonly performed will be installed.

      • Arena Roof Replacement, 09/08/25-01/25/26: The existing roof will be replaced as part of the Capital Renewal project.

      • Generator replacements, 05/12/25 08/13/25: The generators are reaching end of life and replacing these will ensures that systems operate when they are needed to protect occupants.