University of California San Diego

Table of Contents

Locations

  1. Archive

    1. 2024 Edits

      1. Completed April 2024 managed updates

        1. Hillcrest Arbor Drive Reconfiguration

          Add the building footprint for now

          In response to the Hillcrest C3D questions:

           

          1. Is the full building footprint wanted to be represented (found on google maps)? 
            1. This building is connected to 2 other future buildings, but only the First Ave Parking Structure should be represented for now. See graphic below for definition.
          2. Is there a more complete site plan we can use than just the updated road to the south?
            1. Not yet. The Parking Structure has limited access except to the road improvements and the sidewalks shown with those, and the remaining site is still under construction, therefore we only want the road and the building shown at the moment, like below but also with the sidewalks.
          3. what is the name/address for this label?
            1. Name: First Ave Parking Structure. Address: 4245 First Avenue.
          4. How does this connect/ is there a siteplan for how this road ends/interacts with existing ramp/bachman pl road
            1. Bachman Place does not currently connect at the Bachman Parking Structure. There is a hammerhead at the northeast point of the First Ave Parking Structure, and it is now a construction site beyond.