Well drilling for the College’s geoexchange system will take place on both Clothier Lawn and the lawn in front of McCabe during summer 2025. Although we anticipate drilling will need to continue into the start of the fall 2025 semester, this schedule will allow for the majority of the work to take place during the summer, when campus life is slightly slower.