Holyoke Community College

Table of Contents

Locations

  1. Construction

    1. Middle Level Walkway Closed

      • South Plaza between FPA and Donahue as well as the Theater will be under construction for the whole summer (2023).  
      • Theater Code upgrades include new seating, handrails, flooring, stage rigging and the orchestra pit.  This project will replace the existing patio which is also the roof for the tunnels that houses our HVAC/heating/cooling infrastructure.  
      • The ceilings and lights on the second and third floors of FPA will be replaced in May and June.