Holyoke Community College

Table of Contents

Locations

  1. Construction

    1. Student Parking During Construction C and D Lots

      The College and the Department of Capital Asset and Maintenance (DCAMM) will be starting the "Ring Road Project" at the end of this month and continue until the Spring of 2023.

      The project involves replacing water mains, meters, fire hydrants in addition to replacing the drainage structures. Once completed this project will not only result in repaved roads around campus but also allow us to install sprinkler systems in future renovation projects at Frost, Donahue, Marieb and FP&A buildings. Some of the materials for the project have arrived and are being stored in lot P.
      We expect some disruption to traffic patterns throughout the project and will make every effort to keep it to a minimum.

       

      The road stretching from the main entrance on Homestead Ave to George Frost Road will be closed.  

      As you might have noticed, a section of the campus ring road is now closed from the Homestead Avenue entrance heading south due to reconstruction. As a result, A and B lots are closed, while C, D, and E remain open and accessible from the ring road from the opposite direction. As construction progresses through December, lots A and B will reopen and lots C and D will temporarily close. Lot E will be the last to close after C and D lots reopen. The campus road heading north from the main entrance has also reopened, and it's a smooth ride.