Irvine Valley College

Table of Contents

Locations

  1. Construction

    1. Construction between WO1/WO2 and N3 (BSTIC) Walkway

      The walkway between WO1/WO2 (Outdoor Learning Labs) and N3 (BSTIC) will be unavailable Friday, September 4, 2026 due to construction.