Chabot College

Table of Contents

Locations

  1. BOND Measure Construction

    1. Measure A Projects

      1. Men's Baseball Field

        Chabot College's Men's Baseball Program is one of the best!  The field is currently being rebuilt as part of the Measure A Bond project.

        Project Team: 

        Bridging Architect:  HMC Architects

        Construction Manager:  CCM/STV Joint Venture

        Design/Build Entity:  Robert A Bothman Construction (RBC)

          BCA Architects

         

        A Design/Build project consisting of the removal and replacement of the existing baseball field with artificial turf. Install new bleachers, site lighting, dugouts, batting cages, bullpens, storage areas, and scoreboard along with the new code-compliant press box structure with restrooms and accessible pathways.

         

        Project Update:

        •Baseball Field surface changed from Field Turf™ to Astro Turf™
        •Construction started August 2020. Installation of underground utilities are ongoing, as well as installation of footings for Buildings A and B and the backstop piers.

         

        Occupancy: February 2021


        For more information about the Chabot College Men's Baseball Team, check out 

        http://athletics.chabotcollege.edu/sports/bsb/index