University of California San Diego

Table of Contents

Locations

  1. Archive

    1. 2020 Edits

      1. Sept 2020 Completed

        1. Remove wayfinding nodes and reconfigure roadway

          There are a lot of changes going in this corridor and there is still some existing roadway that is available for construction crews.Once we have a better idea of what the final project looks like we will remove the roadway. For now, eliminating the nodes is an acceptable interim measure.

          And adding the reconfiguration with the name change to Pepper Canyon Lane should reduce confusion.