Texas State University

Table of Contents

Locations

  1. Construction and Closures

    1. STEM Building Construction

      From August 2024 thru approximately July 2026, the STEM building construction site will be closed. This site is directly adjacent to the existing Castro Hall construction site and the pedestrian path which previously traveled along the south edge of the fenced area will be closed. This map shows phase 2 of the project and will be updated as needed. Pedestrians are encouraged to utilize the new Bobcat Trail to get around the construction sites.