University of California San Diego

Table of Contents

Locations

  1. Parking

    1. Electric Vehicle Charging

      1. Future Projects

        1. Scholars Parking Structure Future Chargers

          PowerFlex 
          6 DCFCs will be installed before the end of 2024 and additional PowerFlex Level 2 chargers expected by the end of 2025!

          Get Started With: 

          PowerFlex App (Apple)
          PowerFlex App (Android)