Completed in 2019, the 10,000-square-foot Eck Stadium Performance Facility is the centerpiece of the last phase of Eck Stadium development. It features a new strength-and-conditioning center for student-athletes in softball, golf and tennis.
Besides a baseball locker room, the Performance Facility also will house a media room for viewing game videos, player lounge area and offices for coaches and staff. It will provide access to and from the Bombardier Learjet Indoor Practice Facility, as well as to the Shocker dugout on Tyler Field. As part of the project, the Shocker dugout will be moved from the first-base side to the third-base side. It will be enlarged and recessed to enhance safety. Finally, the baseball program’s ticket office will be enlarged and remodeled.