University of Redlands
Search
Table of Contents
Locations
Archive
Completed Round #1 Revisions
Pathway
Add signage
Move two small tree between the pathway (sidewalk) and street.
Add shrubs and cypress tree to the south planter
See link:
https://goo.gl/maps/v3AL3EhkuNF2