STADIUM WAY / SLOPE STABILIZATION
Effective Monday, July 29, 2024 – Through 2025
To accommodate construction related to a slope stabilization effort, Stadium Way will be converted to one lane and turned into a ONE-WAY street from Argonne Drive to Cold Spring Lane. Traffic will enter from Argonne and exit onto Cold Spring. Detour Signs will be posted throughout the area during the slope stabilization and construction beginning July 29, 2024 through 2025.
Please be cautious of the construction vehicles.