EcoMap California

Table of Contents

Locations

  1. California Green Buildings

    1. SavingsByDesign

      1. LAX Terminal 1

        Modernization of the existing 3 story terminal 1. Reprogrammed departures and arrival system will be more balanced and efficient both at curbside and within the terminal.
        Total conditioned area is 301,970 SF.

        www.pgal.com/projects/los-angeles-international-airport-lax-terminal-1-modernization

        100 World Way Los Angeles, CA 90045