A 10,268 sq ft Office building that ranks in the top 22% of projects in this rating system version. Why It's Green: 30% reduction in lighting power density 90% Energy Star Qualified Equipment 75% diversion of construction and demolition debris 35% reduction in indoor potable water use
http://www.gbig.org/activities/leed-1000045991/dashboardWELL CertificationOffice tenant improvement at Shangri-La Construction Headquarters includes new non-load bearing partitions, new floor and wall finishes, new power, data and A/V. The project is pursuing LEED Certification and WELL Pilot Certification. Measures will include replacing VAV boxes, upgrading HVAC controls to DDC system, providing carbon filtration on main air ducts, enhanced acoustical protection and providing all touchless sink faucets to improve hygiene.
The project is located at 550 South Hope Street, a 590,000 square foot building on a .92 acre site in downtown Los Angeles, directly across the street from The California Club and Los Angeles Central Library. The 28-story building, certified LEED Platinum for Existing Buildings, EnergyStar and BOMA’s 360 Performance Building standard,
https://www.wellcertified.com/projects/shangri-la-construction-headquarters
550 S. Hope St, Los Angeles, CA 90071