Long Beach Airport Terminal Improvements in Long Beach is a 46,720 square feet Public Assembly building that ranks in the top 68% of projects in LEED for New Construction 2009 rating system.
Why It's Green:
28% improvement on baseline building performance rating
35% green power purchase
20% recycled content building materials
10% regionally extracted, harvested, recovered, or manufactured materials
50% FSC-certified wood products
75% diversion of construction and demolition debris
75% of occupied space has daylighting
90% of occupied space has quality views
50% reduction in potable landscape water use
35% reduction in baseline indoor water use
http://www.gbig.org/activities/leed-1000003243/dashboard
4100 Donald Douglas Drive, Long Beach Airport (LGB), Long Beach, CA, USA