Site Selection: Built on a previously developed site
Stormwater Design: Quantity and quality achieved
Water Efficient Landscaping: Reduction of landscape irrigation by 50%
Water Use Reduction: 40.8% Water use reduction
Optimize Energy Performance: 93.9% energy cost savings
On-Site Renewable Energy: 91.36% renewable energy
Construction Waste Management: 77.52% construction waste diverted from landfills
Low-Emitting: Utilized low voc adhesives, sealants, paints, coatings, flooring systems, wood and Agrifiber
Daylight and Views – Daylight: 79.54% of regularly occupied area that is daylighted
Innovation and Design: Green Cleaning and Pest Management
https://sustainpro.org/coastline-equipment-long-beach-hq/
https://www.usgbc.org/projects/coastline-equipment-long-beach-hq-bldg
6242 Paramount Blvd Bldg A, Long Beach, CA 90805