  1. Active Construction Projects

    1. Ruch Engineering

      Three projects:

      • Ruch Engineering Building Boiler, 07/10/24-12/16/25: This project will replace the existing boiler with a new. unit to ensure the building can operate optimally. 
      • Ruch Generator, 5/12/2025-9/02/2025
      • RUCH 101 remodel, 5/30/2025-8-15/2025: Remodel RUCH Room 101 to create four new offices.