Boise State University Campus Map
Search
Table of Contents
Locations
Active Construction Projects
Ruch Engineering
Three projects:
Ruch Engineering Building Boiler, 07/10/24-12/16/25:
This project will replace the existing boiler with a new. unit to ensure the building can operate optimally.
Ruch Generator, 5/12/2025-9/02/2025
RUCH 101 remodel, 5/30/2025-8-15/2025:
Remodel RUCH Room 101 to create four new offices.