  1. Capital Renewal Projects

    1. ExtraMile Arena

      In fiscal years 2023-2024, Boise State received $90M in deferred maintenance funds from the State of Idaho. These funds will allow us to complete several top projects on the university’s capital renewal/deferred maintenance list. Projects on this list address deficiencies in our campus facilities and infrastructure that had been deferred until funds were available. View more on our website.

      • Generator Replacements: These generators are reaching end of life. Parts are difficult to find and increased service costs make these good candidates for replacement. Generators backup critical life safety systems during a power outage such as our fire alarm systems, egress lighting, elevators, and OIT systems. Replacing these generators ensures that these other systems operate when they are needed to protect occupants. Additionally, several of these generators will be connected to the campus remote monitoring system which allows our maintenance crew to get notified and respond faster to emergency situations on campus.
      • Chilled Water Replacement: The chilled water system in EMA is original to the building and has reached end of life. This project will replace the system with a new modern chilled water system. This will increase the energy efficiency of the plant, as well as provide better control over the operation of the plant. Impact: This ensures EMA can continue to provide top quality shows and concerts for Boise.
      • Roof Replacment: The roof has reached end of life and is in need of replacement. This will allow EMA to continue providing shows and events to Boise.