Swarthmore College

Table of Contents

Locations

  1. Current and Future Construction

    1. Geoexchange System, North Extension

      As part of the To Zero By Thirty-Five (20X35), some of the existing underground steam pipes will be replaced with a new geoexchange system. As this system expands, the remaining pipes will be removed and replaced. Learn more about the 20x35.